Now the answer isn’t performance testing, the answer is that there is no odd one out, they should all work together.

The Problem.

Performance testing has traditionally been shunted to the end of the project lifecycle where it has been seen as a must have tick in the box for go live, rather than an essential type of testing, critical to the final decision of whether the project should go live. It is almost always squeezed in to a shorter timeframe than originally planned as the development and functional testing over runs and the go live date doesn’t change. With this approach, when problems are found so close to go live it can be very expensive to fix them.

The main Issues:

  • Performance not really considered by the project until the performance tests are run
  • Performance is not always considered by Functional testers
  • Performance issues not found until the end
  • No time to address performance issues properly
  • Performance fixes are expensive to fix at the end of the development process

Performance testers have been campaigning for a long time to have performance testing considered throughout the development lifecycle. The problem is not just one of timing that is just a symptom. No it is a problem of projects not seeing the benefit of considering performance testing as part of the whole development lifecycle and in not doing so they don’t realise the tangible benefits it can give. Too often projects push performance testing to the last minute where they have to pay for the tests but have little or no time to do something about the problems raised. All the pain and none of the gain.

 

How the performance tester feels:

When Agile and DevOps arrived it seemed like the perfect opportunity to resolve this problem once and for all. The foundation of Agile combined with DevOps is that every discipline is involved throughout the project to produce a better product. So I asked ‘Where does performance testing fit in Agile?’, the response I got back was ‘in a performance hardening iteration at the end’. This sounded depressingly familiar.

The thinking.

One of our customers was keen to work with us and do things better, together we looked for a practical strategy to build in a performance testing element throughout the system development lifecycle. The team were helped by the customer to some extent as the customer favoured the DevOps shift left model. The team had already created an automated functional smoke test followed by an automated functional regression test as part of the integrated release process and it seemed a natural progression that we should include a performance testing element.

The belief was that you needed to performance test a production like load on a production like environment for it to have any meaningful value. Anything less could be considered a waste of time as the complexity of the system and the number of variable makes it practically impossible to interpret the results in relation to what you see in a production like environment. The thinking was that to test earlier in the SDLC like this doesn’t work for a number of reasons:

  1. You don’t have the code that is actually going into production as it will be continuing to change.
  2. You don’t have all the functionality to put a live like load on the system as it hasn’t all been developed.
  3. You generally don’t have a live like environment in the early stages of a project.
  4. You don’t always have the full testing analysis completed (all scenarios, user volumes etc.).

The perfect option to test earlier in the Agile SDLC with a production like environment and a production like load doesn’t fit. So what could be done?

Benchmarking came up as an option. Benchmarking is about running the same test before and after a change or changes are made and comparing the results, this will identify the impact the changes have made. However a benchmark test does not have to be a production like load. People tend to assume that a benchmark will tell them if they can go live or not. However as 99.9% of the benchmarks are not “production like” in terms of the transaction mix or volumes the results are not going to be indicative of performance in production. That has not stopped some projects from doing transaction specific benchmarks as their only performance testing and then discovering when it goes live that the system doesn’t cope with the combined load.

The solution was to utilise simple benchmarking tests as part of the answer, but it is not the complete solution.

The Solution

Part A of the Solution:

The project although not pure agile was  broken down into several phases with each phase made up of a number of 3 week sprints, at the beginning of each phase there was a short window to plan and organise the phase.  Each phase was targeted at part of the overall functionality and it was not until all phases were complete that the product would be ready to be released into production. The initial phases focused on developing web services and later moved to developing the GUi’s that would consume them.

The project started by building a number of web services. We had put together an automated functional smoke test followed by an automated functional regression test as part of the continuous integration cycle. So taking that one step further we introduced simple performance benchmarking of the web services.

Continuous Integration Cycle

 These benchmarks were not targeted at “production like” volumes but were scaled to give a reasonable load for the available infrastructure with only basic response time information being collated. The aim of these tests was to get an idea of the performance, but it was important that the tests did not take a long time to set up and run and unduly slow the whole continuous integration process down.

These initial tests proved valuable from the start, with the results showing that the web services response times were not responding fast enough to meet the requirements, even under low usage. This enabled the developers to revise the underlying design very early on in the process and the response times dropped to well under the stated requirements.

In the same way that the automation smoke and regression tests were added to and maintained the performance test benchmarks were also kept current throughout the SDLC.

This process worked well and it highlighted numerous occasions where the code wasn’t performant or a change had adversely affected the performance. This proved very efficient as degradation in performance could usually be attributed to the last set of changes which meant that identifying the root cause of the problem and fixing it was generally straight forward.

The benchmarks also highlighted a couple of instances where previously identified and resolved performance issues were reintroduced as a result of the old code being picked up and packaged. This was not strictly a performance issue but one of version control and code management and was highlighted early by the benchmarks saving a large amount of rework. So not only did the tests help improve the code they also identified issues with the release process.

As the GUI was released we developed benchmarks based around the key business transactions and included these in the performance benchmarking suite.

The benchmarks added real value but they didn’t give us the whole story.

 

Part B of the Solution:

Even with the benchmarks we still would not know how the system would perform in “production like” conditions. So the second part of the solution was to run some Performance hardening iterations. These are windows were “production like” loads are placed on the system.

Project Build Structure

 

 We ran a performance hardening iteration at the end of the second to last phase and another at the very end of the last phase. The end of the second to last phase was identified as the earliest point a “production like” environment would be available for testing and we felt that enough of the application was developed to give the test results real value.

These “production like” performance tests were set up very quickly and the execution window was short for the following reasons:

  • We had a full understanding of the business transactions and their test data needs gained developing the benchmarking.
  • We had reusable test assets from the benchmarks
  • We had established the relationships with the support people already in place and had a proven effective process to address identified issues. This had been developed and refined during the benchmarking.
  • A number of performance issues were identified and resolved during the benchmarking and before the performance hardening sprints.

No major performance issues were found during the hardening iterations. This was in contrast to the significant number found in the benchmarking.

 

Costs

This is a difficult area to quantify. Performance testing skills were required at various points throughout the SDLC rather than just at the end. But the windows required at the end were considerably shorter than a more traditional approach because of the assets and IP developed during the early engagement and the reduced number of performance issues. The performance issues were discovered much earlier in the project life cycle and it was much easier to find the root cause and resolve them and resulted in cost savings and better value to the client.

Quality

Quality improved throughout the project as performance issues were identified early enough for designs to change and issues to be addressed properly. Performance was a design consideration early and as a result performance was designed into the solution. In contrast, if significant performance issues are found at the end of a project there is not always the time or resources to resolve the issue properly. In some cases the problems have to be lived with, or the problem is masked by scaling the system. In either case the problem is still there and that quality debt will follow the system throughout its life until it is resolved or the system is decommissioned.

Conclusion

The application was delivered faster and was a better quality application given the approach we adopted. Early performance benchmarks highlighted performance issues when they were cheaper to fix and had the added advantage of focusing the whole team in the performance area.  As a result the time required to setup and run the production like performance test was reduced.

One size never fits all and if this solution doesn’t work for your project, don’t give up and accept a window at the end, work with the project to come up with a solution that does work.  Agile and DevOps is about engaging the right people earlier and this includes performance testers.

 

 

 

 

 

 

Good article and expressed the challenges and solutions we face with an Agile SDLC and the role of testing within this.

Like
Reply

Good article. Thanks. Performance test should be treated like any other test and should to be part of DevOps iterations.

Like
Reply

Will be made that little bit easier, keep going!

Like
Reply

Outstanding summation of an endemic industry problem Mark and similarly the solution you gave provided. With innovative thought leadership such as this the cultural paradigms that need to also be embraced by Organisations who are transitioning the the Agile-DevOps model

Like
Reply

To view or add a comment, sign in

More articles by Mark Wilson

Others also viewed

Explore content categories