Production Profile Optimisation

Production Profile Optimisation

To be honest you don’t get many opportunities to challenge the production profile. Even though its not fixed, it is quite often treated as a frozen input in our FA model. However, if the study is still in Concept and/or the Client sees the benefits in slightly changing the profile, you may get the opportunity.

This was just the case in this example. As we were also looking at the economics, we could assess the effects of changing the production profile slightly to obtain the optimum economic solution.

The development consisted of two new WHPs tieing back to an existing CPP. A workflow was established to assess the effect of pipeline sizes on the overall project economics. At the heart of the workflow was a simple IPM model which would allow us to assess the change in production profile required so that smaller pipeline sizes could be utilized.

No alt text provided for this image

An initial line sizing was conducted and two pipeline sizes were examined for the longer pipeline to the CPP from Field A (12” and 16”). The effect of changing the pipeline size for Field B to Field A was investigated. From this a 16” Field A and 10” Field B and a 12” Field A and 10” Field B comparison was selected.

No alt text provided for this image

A life of field analysis was then performed on the two cases as shown below. It showed that the required reservoir for a 16” pipeline was less than or equal to the available reservoir pressure across the whole of field life. Whereas reducing the line size to 12” meant that the required pressure slightly exceeded the available pressure from Year 8 to Year 11. In a normal study this would have been the end and 16” would be selected. However given there would only be a small reduction in production required and it would be in Year 8 the economics may favour the reduced CAPEX and production deferment.

No alt text provided for this image

A simple IPM model was created (with the reservoir modelled as a tank) to deter mine the production profile which could be achieved with the small 12” pipeline. As can be seen below this results in a very minor reduction of the gas recoverable and hence when the economics was performed it was the optimum solution.

No alt text provided for this image

Optimising the production profile is not always possible, sometimes there are gas sales agreements in place and the penalties for not meeting the agreements fundamentally changes the economics. However, sizing your pipeline for operation many years later in the fields life, when the field is off plateau, is probably not the optimum design unless there are penalties.


The only thing the client is interested in is maximizing NPV and uptime, other things no interest.

Like
Reply

To view or add a comment, sign in

More articles by Christopher Cooper

  • RAM of Entire LNG Supply Chain

    Background An Operator was evaluating the possibility of building a new LNG plant in N Africa for the liquefaction of…

    2 Comments
  • Wax Operating Envelopes

    In a recent study conducted we performed a study on a gas condensate network which had just drilled an oil well with a…

    7 Comments
  • Existing Assets - RAM Updates

    RAM Studies are performed during design to predict the availability of the system over the entire life of field…

    2 Comments
  • Flow Assurance aiding GHGE reductions

    How can flow assurance help reduce GHGEs and help move towards zero venting / zero flaring? It can’t help achieve this…

    7 Comments
  • FA & Safety - not your usual interfacing

    When you think of flow assurance interfacing with other disciplines, you’d usually think about interfacing with…

  • Liquid surges from new tie-backs

    We just completed an interesting study where a new tie-back was to be started up and whilst all the design data had…

    6 Comments
  • Cold Flow?

    The concept of cold flow is a combined hydrates/wax philosophy based around allowing hydrate (and wax) to form but in…

    11 Comments
  • Chemical Injection Optimisation over Field Life

    The field had been operating for many years and I was requested to revisit the original Flow Assurance Report and…

    3 Comments
  • RAM in (De)Manning Studies

    General As part of COMPANY’s drive towards improved safety, efficiency and reliability the development was being…

    5 Comments
  • When to consider flexibles?

    The simple answer is “always” and “as early as possible”. So to explain that first, why shouldn’t we always consider…

    2 Comments

Others also viewed

Explore content categories