From the course: CompTIA Project+ (PK0-005) Cert Prep
Unlock this course with a free trial
Join today to access over 25,500 courses taught by industry experts.
Software change control
From the course: CompTIA Project+ (PK0-005) Cert Prep
Software change control
- What are some steps that you should consider when it comes to software changes? Join us, we're going to talk about it. - [Announcer] You are watching ITPro TV. (upbeat music) - Thank you so much for joining us in this episode. I'm your host, Lauren Deal, and with me is Robin Abernathy, and we're continuing our conversation about change control, but this one is all about software. - All about software. - Yeah. - So we're talking specifically about software changes. Now, we had a change control process that we presented to you many episodes ago that was about project changes, but these are going to include some of the steps that you need to include if your project is developing a software application and some of the things that you need to consider that may have not been presented in those original steps that I gave you, okay? So first of all, let's talk about what we call requirements definition. Anytime a software or application change is requested, it is important to fully document…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
(Locked)
Project change control process8m 24s
-
(Locked)
Manage change6m 12s
-
(Locked)
IT infrastructure change control4m 53s
-
(Locked)
Software change control5m 41s
-
(Locked)
Cloud vs. on premises in change control4m 33s
-
(Locked)
Continuous integration/continuous deployment (CI/CD) process4m 6s
-
(Locked)
Production vs. beta/staging environments4m 39s
-
(Locked)
-
-